Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves the realigning of a portion of Foxes Run, lowering of the connected pond to facilitate the removal of an existing dam, and the installation of a walking path and boardwalk along with other associated improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
CONTRACT “A” – GENERAL SITE CONSTRUCTION 1.Park redevelopment project with work including, but not limited to, stripping and placing topsoil, importing fill, common excavation, asphalt pavement replacement, concrete flatwork, concrete staircase, handrail, dense graded base, storm sewer, water utility, fencing, playground equipment, pour in place playground surfacing, erosion control, irrigation, landscaping, seeding, and site restoration. 2.Alternate Bids as represented in the Contract Documents. 3.All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 1” – SODDED TURF ATHELTIC FIELD IN LIEU OF SEED 1.Site improvement work for sodding the multi-use athletic field in lieu of the base bid item for athletic field seeding. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 2” – METAL SHADE STRUCTURE IN LIEU OF FABRIC 1.Providing and installing a metal roof shade structure in lieu of the base bid item for a fabric shade structure. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 3” – SOCCER GOALS 1.Providing and installing a set of soccer goals for the multi-use athletic field. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 8, 2026
Close: Jan 27, 2026
CONTRACT “A” – GENERAL SITE CONSTRUCTION 1.Park redevelopment project with work including, but not limited to, stripping and placing topsoil, importing fill, common excavation, asphalt pavement replacement, concrete flatwork, concrete staircase, handrail, dense graded base, storm sewer, water utility, fencing, playground equipment, pour in place playground surfacing, erosion control, irrigation, landscaping, seeding, and site restoration. 2.Alternate Bids as represented in the Contract Documents. 3.All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 1” – SODDED TURF ATHELTIC FIELD IN LIEU OF SEED 1.Site improvement work for sodding the multi-use athletic field in lieu of the base bid item for athletic field seeding. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 2” – METAL SHADE STRUCTURE IN LIEU OF FABRIC 1.Providing and installing a metal roof shade structure in lieu of the base bid item for a fabric shade structure. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 3” – SOCCER GOALS 1.Providing and installing a set of soccer goals for the multi-use athletic field. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid.
The Agency will consider all redevelopment proposals and the financial and legal ability of the prospective redevelopers to carry out the proposals and the Agency may negotiate with any developers for purchase or lease of any real property in the redevelopment area.
Posted Date
Jan 15, 2026
Due Date
Jan 30, 2026
Release: Jan 15, 2026
Close: Jan 30, 2026
The Agency will consider all redevelopment proposals and the financial and legal ability of the prospective redevelopers to carry out the proposals and the Agency may negotiate with any developers for purchase or lease of any real property in the redevelopment area.
AvailableRedevelopment Consulting Services.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Redevelopment Consulting Services.
AvailableProcurement of property acquisition services for redevelopment.
Posted Date
Dec 17, 2025
Due Date
Jun 30, 2026
Release: Dec 17, 2025
Close: Jun 30, 2026
Procurement of property acquisition services for redevelopment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →