Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
CONTRACT “A” – GENERAL SITE CONSTRUCTION 1.Park redevelopment project with work including, but not limited to, stripping and placing topsoil, importing fill, common excavation, asphalt pavement replacement, concrete flatwork, concrete staircase, handrail, dense graded base, storm sewer, water utility, fencing, playground equipment, pour in place playground surfacing, erosion control, irrigation, landscaping, seeding, and site restoration. 2.Alternate Bids as represented in the Contract Documents. 3.All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 1” – SODDED TURF ATHELTIC FIELD IN LIEU OF SEED 1.Site improvement work for sodding the multi-use athletic field in lieu of the base bid item for athletic field seeding. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 2” – METAL SHADE STRUCTURE IN LIEU OF FABRIC 1.Providing and installing a metal roof shade structure in lieu of the base bid item for a fabric shade structure. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A – ALTERNATE 3” – SOCCER GOALS 1.Providing and installing a set of soccer goals for the multi-use athletic field. 2.All necessary work to complete the proposed alternate as represented in the construction documents shall be included in the CONTRACTOR’S bid.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
The Town of Basalt is accepting proposals from qualified firms capable of providing design-build services for the Cliff’s Hillside Park Renovation Project.
Posted Date
Jan 7, 2026
Due Date
Feb 27, 2026
Release: Jan 7, 2026
Close: Feb 27, 2026
The Town of Basalt is accepting proposals from qualified firms capable of providing design-build services for the Cliff’s Hillside Park Renovation Project.
AvailableSeeking a development partner to serve as the designated redeveloper for a portion of redevelopment area. Requesting proposals from qualified redevelopers to implement a realistic redevelopment project and to construct site improvements, building(s) and parking facilities for properties located in the gateway redevelopment project area. It is the preference of the city and para that the site be developed as a mixed-use destination development that will encompass an entertainment and/or hospitality element. This ideal location has great market potential and the city would like to develop it proactively to establish an attractive entrance to the city, to complement and integrate with the smith street commercial corridor, and to take advantage of the planned billion-dollar riverton project, just across the river from this site.
Posted Date
Sep 15, 2025
Due Date
Jan 29, 2026
Release: Sep 15, 2025
Close: Jan 29, 2026
The purpose of this project is to restore fish passage to Butler Creek, and independent tributary to the Strait of Juan de Fuca. At Pillar Point County Park, culvert #993889 (WDFW FPDSI #'s are used in this RFP) is a fish passage barrier and is tidally influenced. Integration of habitat restoration elements that are beneficial to/required by the civil project will be expected.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
The purpose of this project is to restore fish passage to Butler Creek, and independent tributary to the Strait of Juan de Fuca. At Pillar Point County Park, culvert #993889 (WDFW FPDSI #'s are used in this RFP) is a fish passage barrier and is tidally influenced. Integration of habitat restoration elements that are beneficial to/required by the civil project will be expected.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a development partner to serve as the designated redeveloper for a portion of redevelopment area. Requesting proposals from qualified redevelopers to implement a realistic redevelopment project and to construct site improvements, building(s) and parking facilities for properties located in the gateway redevelopment project area. It is the preference of the city and para that the site be developed as a mixed-use destination development that will encompass an entertainment and/or hospitality element. This ideal location has great market potential and the city would like to develop it proactively to establish an attractive entrance to the city, to complement and integrate with the smith street commercial corridor, and to take advantage of the planned billion-dollar riverton project, just across the river from this site.