Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of upgrading the existing greenfield pump station equipment to increase its flowrate capacity for future development within the capture area. The proposed improvements include two submersible wastewater pumps (Grundfos SEV.30.A30.250.2.52H.EX.61 R.A) set to 200 GPM @ 143.7 feet of total dynamic head (tdh), 10k muffin monster mounted within the wet well, mercury float switch configuration, electrical panel, 100kw generator, and new electrical wiring. The existing scada equipment will be reconnected to the new electrical improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
AvailableProcurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
Posted Date
Nov 23, 2025
Due Date
Jan 6, 2026
Release: Nov 23, 2025
Close: Jan 6, 2026
Procurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
AvailableDemolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis