CityIN
Posted
Nov 9, 2026
Dec 10, 2026
Green St. Corridor Improvements Phase 1 RFP
project includes installation of a new traffic signal, minor traffic signal improvements, and installation of medians to restrict turning movements.
Description: The Green St. Corridor Improvements -- Phase 1 project includes installation of a new traffic signal at Green St. and Whittington Drive, minor traffic signal improvements at Green St. and the I-74 westbound ramp, and installation of medians to restrict turning movements at Green St. and the Kroger entrance.
FireDepartment · IN, US
Adjacent opportunities open for bidding right now.
CityIN
Posted
Nov 9, 2026
Dec 10, 2026
project includes installation of a new traffic signal, minor traffic signal improvements, and installation of medians to restrict turning movements.
CityBC
Posted
-
Dec 17, 2026
The City of Port Coquitlam (the “City”) is seeking information from qualified engineering consultants, technology providers, and other organizations with demonstrated experience in anaerobic digestion (AD) to inform the potential Phase 2 of the Kingsway Green Energy Corridor initiative. The City initially identified the opportunity to develop a District Energy System (DES) along the Kingsway corridor between Downtown Port Coquitlam and the Mary Hill Bypass. This concept would be implemented in two phases: Phase 1: A low temperature DES based on wastewater heat that would feed an identified localized City-owned facility to start Phase 2: A Regional Resource Recovery Centre (R3C) based on anaerobic digestion that could produce high-grade heat for industrial consumers along Kingsway or support another beneficial end use (Biogas, RNG, CHP, etc.) (Approx. 50,000 tonnes/year dried bio-solids/food waste) The proposed R3C may incorporate anaerobic digestion of municipal, industrial, commercial, and institutional (ICI) organic feedstocks to produce biogas, offset greenhouse gas (GHG) emissions, and support local renewable energy production. The resulting biogas may be used for renewable natural gas (RNG) production, combined heat and power, direct thermal use, or another end use. The City will also consider opportunities for the beneficial management and use of digestate and other process residuals.
Connecticut State Contracting Standards Board
State AgencyCT
Posted
Oct 28, 2026
Jan 7, 2027
Work includes removal and replacement of building expansion joints; select repointing of deteriorated mortar joints; removal and replacement of select sealant joints including window, door, and louver perimeter joints, and coping sealant joints; select repairs to roof scuppers; offsite disposal of all removed materials.
CityAK
Posted
Nov 2, 2026
Dec 2, 2026
Remove and replace pile wraps and anodes including new locations for each. Perform surface preparation and coating of steel piles, substructure, and fender components. Rehabilitate dock and dolphin fender systems. Repair concrete deck and replace expansion joint. Replace timber bracing, decking, stub piles, and guardrail at Harbor View Park. Alternate 1 - berth I & II dock/mooring bollard pile wraps, alternate 2 - berth I & II dock fender rehabilitation, alternate 3 - original berth II dock, mooring bollard and fender pile anodes, alternate 4 - berth III marine facilities dock, mooring bollard and fender pile anodes, alternate 5 - berth III marine facilities pile wraps, alternate 6 - berth III marine facilities - tendering float pile coatings, alternate 7 - berth III marine facilities - dolphin, FDMD and tendering float anodes, alternate 8 - berth III marine facilities - concrete deck repair, alternate 9 - Harbor View Park - timber deck replacement.
Decision makers connected to this RFP from Brownsburg Fire Territory.
Solicitation files and supporting documents for this bid.