Summary
Renovations include the regrading of the existing football field with new irrigation, drainage, concrete curb, grass sod, synthetic turf at team bench areas, and new athletic equipment. The existing asphalt running track will be resurfaced with a mill and overlay of new asphalt and a rubber running surface. The "D" zones of the football field will receive new asphalt pavement and rubber surface for new track events. New and relocated track events will be built outside the running track. New fencing and concrete sidewalks around the track will be installed. Two new buildings will be built. A new football concession stand building will be built on the west end of the stadium. A new softball restroom & locker room building is to be built on the south side of the softball field. New site utilities including storm, sanitary, water & electric will be included at both new buildings.