CountyAB
Posted
Sep 1, 2026
Sep 15, 2026
GRAVEL PIT RECLAMATION
Smoky Lake County is inviting qualified proponents to submit proposals for gravel pit reclamation work at a site located at NE 09-58-15 W4, covering approximately 16 hectares (40 acres). The scope includes equipment mobilization and demobilization, removal and burial of deciduous tree regrowth under three metres, topsoil stripping, recontouring, and redistribution of topsoil to a minimum depth of 15 cm (6 inches). The work is scheduled for Fall 2026, with an estimated contract period from October 1, 2026, through October 31, 2026, and the posting does not indicate that it is a grant program.