Summary
In general, the work consists of: Removal of approx. 26,000 SF of existing thermoplastic roofing system down to the existing metal roof panel or existing roof deck. Provide infill between metal panel ribs, cover with flat and/or tapered insulation and gypsum coverboard to an R-30 system with a mechanically attached and fully adhered 60-mil reinforced EPDM roof membrane. Recover approximately 8,000 square feet of existing thermoplastic roof system with a gypsum coverboard and a 60-mil reinforced fully adhered EPDM. Additionally
the project will remove and replace approx. 200 SF of standing seam metal panels. Provide prefinished sheet metal flashings, wall panels, and accessories as required.