Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: replacement of existing ramp with added rip rap protection, installation of new shore interface and dock. Enhancement of launch prep area with pavement markings to aid in boat launching process; Replacement of existing ramp with added rip rap protection, new shore interface, new dock, clearing and grubbing of trees to widen launch area and parking, additional gravel and grading for drainage, solar lighting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Larose Public Boat Launch Improvements solicitation is for construction improvements including installation of a vinyl sheet pile bulkhead, timber piles, boat ramps, and related work, with a base estimate of $480,000 and an Alternate 1 estimated at $80,000. Electronic bids are to be submitted through Central Auction House and will be received at the Lafourche Parish Civil Service Building until the bid opening. Bidders must hold a Louisiana State Contractor's License in Heavy Construction and obtain plans/specifications via Central Auction House or from the Engineer (Picciola & Associates) for a $100 deposit.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
The Larose Public Boat Launch Improvements solicitation is for construction improvements including installation of a vinyl sheet pile bulkhead, timber piles, boat ramps, and related work, with a base estimate of $480,000 and an Alternate 1 estimated at $80,000. Electronic bids are to be submitted through Central Auction House and will be received at the Lafourche Parish Civil Service Building until the bid opening. Bidders must hold a Louisiana State Contractor's License in Heavy Construction and obtain plans/specifications via Central Auction House or from the Engineer (Picciola & Associates) for a $100 deposit.
AvailableConstruction of a boat launch site. Work includes but is not limited to clearing and grubbing, dredging, earthwork, single lane concrete ramp with floating docks, and paving. Site improvements include landscaping and miscellaneous site amenities. The launch ramp shall be installed utilizing a push-slab concrete construction method.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
Construction of a boat launch site. Work includes but is not limited to clearing and grubbing, dredging, earthwork, single lane concrete ramp with floating docks, and paving. Site improvements include landscaping and miscellaneous site amenities. The launch ramp shall be installed utilizing a push-slab concrete construction method.
AvailableBoat launch ramp upgrade, includes facility upgrades, but is not limited to, extension of the launch ramp to allow longer seasonal use of the lake, replacement of the boarding floats, removal and replacement of non-compliant accessible pathways making them compliant, revising the configuration and layout of onsite sidewalks and accessible pathways to promote a more efficient and compliant systems of walks, retrofit of the trailer parking layout for efficiencies and accessibility compliance, upgrade the handicap parking, mill and repaving of the parking lot, upgrade of facility signage, and cleaning of existing onsite stormwater treatment units (project). There are also three additive alternates as part of this project: (1) removal of the existing restroom facility and placement of a new, modular restroom facility; (2) removal of the existing fish cleaning station and placement of a new fish cleaning station; and (3) construction of a new kiosk shed for district staff.
Posted Date
Dec 26, 2025
Due Date
Jan 16, 2026
The Wisconsin Department of Administration’s Division of Facilities Development is soliciting bids for parking lot pavement improvements at the Mauston Readiness Center for the Wisconsin Department of Military Affairs. The project (24E8C) has an estimated construction cost of $520,000 and includes a pre‑bid tour on January 14, 2026. Public bid documents are posted on the state’s e‑Builder portal and bids are due on February 18, 2026.
Posted Date
Dec 23, 2025
Due Date
Feb 18, 2026
Release: Dec 23, 2025
Close: Feb 18, 2026
The Wisconsin Department of Administration’s Division of Facilities Development is soliciting bids for parking lot pavement improvements at the Mauston Readiness Center for the Wisconsin Department of Military Affairs. The project (24E8C) has an estimated construction cost of $520,000 and includes a pre‑bid tour on January 14, 2026. Public bid documents are posted on the state’s e‑Builder portal and bids are due on February 18, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 16, 2026
Boat launch ramp upgrade, includes facility upgrades, but is not limited to, extension of the launch ramp to allow longer seasonal use of the lake, replacement of the boarding floats, removal and replacement of non-compliant accessible pathways making them compliant, revising the configuration and layout of onsite sidewalks and accessible pathways to promote a more efficient and compliant systems of walks, retrofit of the trailer parking layout for efficiencies and accessibility compliance, upgrade the handicap parking, mill and repaving of the parking lot, upgrade of facility signage, and cleaning of existing onsite stormwater treatment units (project). There are also three additive alternates as part of this project: (1) removal of the existing restroom facility and placement of a new, modular restroom facility; (2) removal of the existing fish cleaning station and placement of a new fish cleaning station; and (3) construction of a new kiosk shed for district staff.
Available