Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump station rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition and removal of existing three (3) Stormwater Pumps and pump station roof. Furnish and install three (3) new vertical turbine Stormwater Pumps and new precast concrete roof. Stormwater Pumps shall be in-kind replacement of existing pumps. New roof shall have three (3) access hatches, one above each stormwater pump with associated drain piping and fittings.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
Demolition and removal of existing three (3) Stormwater Pumps and pump station roof. Furnish and install three (3) new vertical turbine Stormwater Pumps and new precast concrete roof. Stormwater Pumps shall be in-kind replacement of existing pumps. New roof shall have three (3) access hatches, one above each stormwater pump with associated drain piping and fittings.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to construct a pumping station. The pump station will contain three horizontal split case pumping units initially with space for one additional future pumping units; associated piping, valves, electrical, instrumentation, hvac equipment, steelwork, buried utilities, and all appurtenant work indicated or specified.
Posted Date
Jan 23, 2026
Due Date
Feb 20, 2026
Release: Jan 23, 2026
Close: Feb 20, 2026
Work includes to construct a pumping station. The pump station will contain three horizontal split case pumping units initially with space for one additional future pumping units; associated piping, valves, electrical, instrumentation, hvac equipment, steelwork, buried utilities, and all appurtenant work indicated or specified.
AvailableEquipment and structure rehabilitations, demolition and replacements and appurtenant work.
Posted Date
Dec 31, 2025
Due Date
Feb 11, 2026
Release: Dec 31, 2025
Close: Feb 11, 2026
Equipment and structure rehabilitations, demolition and replacements and appurtenant work.
AvailableIn general, the work includes furnishing all labor, materials, and equipment necessary for the installation of approx. 13,655 LF of 6" PVC watermain; 3,940 LF of 8" PVC watermain; 1,275 LF of 10" PVC watermain; 3,165 LF of 10" non potable watermain, 1" service connections; meter installations and connections to onsite plumbing at each residence as shown on the plans, back flow preventers, fire hydrant services and installation of hydrants and abandonment of existing water mains. The new watermains will connect to the existing water distribution system at multiple connection points as shown on the plans. In addition, the work includes furnishing all labor, materials, and equipment necessary to complete improvements to 9th street. This includes the reconstruction of a new asphalt concrete section between the intersections of 9th street & LAS Palmas Avenue and 9th street & Sperry Avenue, curb ramps at the intersection of e street and LAS palmas along 9th street, new concrete drive approaches and associated concrete sidewalk improvements and aggregate base swales. Utility improvements consist of adjusting existing utility boxes and structures within 9th street to grade. Signage and striping improvements consist of new centerline striping along 9th street, stop bars and crosswalk striping and the relocation of existing signage outside the proposed improvements.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
In general, the work includes furnishing all labor, materials, and equipment necessary for the installation of approx. 13,655 LF of 6" PVC watermain; 3,940 LF of 8" PVC watermain; 1,275 LF of 10" PVC watermain; 3,165 LF of 10" non potable watermain, 1" service connections; meter installations and connections to onsite plumbing at each residence as shown on the plans, back flow preventers, fire hydrant services and installation of hydrants and abandonment of existing water mains. The new watermains will connect to the existing water distribution system at multiple connection points as shown on the plans. In addition, the work includes furnishing all labor, materials, and equipment necessary to complete improvements to 9th street. This includes the reconstruction of a new asphalt concrete section between the intersections of 9th street & LAS Palmas Avenue and 9th street & Sperry Avenue, curb ramps at the intersection of e street and LAS palmas along 9th street, new concrete drive approaches and associated concrete sidewalk improvements and aggregate base swales. Utility improvements consist of adjusting existing utility boxes and structures within 9th street to grade. Signage and striping improvements consist of new centerline striping along 9th street, stop bars and crosswalk striping and the relocation of existing signage outside the proposed improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →