CountyLA
Posted
Oct 7, 2026
Nov 5, 2026
Description: The Bossier Parish Police Jury is seeking bids for construction of Well #29 on Goodwill Road at Highway 80, replacing Well #23. Project No. 2026-123 is associated with Consolidated Waterworks/Sewerage District No. 1 of the Parish of Bossier. The solicitation is an invitation for bid, issued October 7, 2026, with bids due November 5, 2026.
County · LA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Bossier Parish.
Adjacent opportunities open for bidding right now.
CountyLA
Posted
Oct 7, 2026
Nov 5, 2026
The Bossier Parish Police Jury is seeking bids for construction of Well #29 on Goodwill Road at Highway 80, replacing Well #23. Project No. 2026-123 is associated with Consolidated Waterworks/Sewerage District No. 1 of the Parish of Bossier. The solicitation is an invitation for bid, issued October 7, 2026, with bids due November 5, 2026.
South Sangamon Water Commission
Special DistrictIL
Posted
Oct 5, 2026
Nov 3, 2026
Construction of well rehabilitation 2026-2027.
CityAZ
Posted
Sep 9, 2026
Oct 15, 2026
Project consists of demolition of the existing soft starter/mcc section that powers the existing 200 hp well pump at well sites 10, 11, and 12 each. Provide new standalone reduced voltage soft starter (rvss) for existing 200 hp well pump at well site, 10, 11, and 12 each as indicated on drawings. Provide required cable and conduit to complete the installation of the new soft starter, and commissioning of the work.
Special DistrictWA
Posted
Oct 1, 2026
Oct 14, 2026
Schedule A - Mobilize and prepare site; construct gabion walls; stabilize slope; erosion control; install a precast concrete utility vault, trench safety systems for worker protection during excavation, 4" and 8" DI water mains and connection assemblies, combination air release/air vacuum valves and fittings, and well house piping and mechanical; build new well house, foundation, and building; structural and architectural improvements; restore site. Schedule B - Provide well pumping equipment, instrumentation, and electrical work to make the well operational.