Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of new storm sewer construction, storm sewer repairs, CIPP lining, and manhole and inlet construction & rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Raytown, MO (SWM-2025-03) is soliciting sealed bids for the GO Bond - Eastside Industrial District Storm Sewer Improvements project comprising new storm sewer construction, storm sewer repairs, CIPP lining, and manhole and inlet construction & rehabilitation. A non-mandatory Pre-Bid Conference and optional site visit will be held December 16, 2025 at 1:00 PM at Raytown City Hall; sealed bids are due December 31, 2025 at 2:00 PM and will be publicly opened the same day. Bidding documents and plans are distributed through Drexel Technologies' planroom (registration/login and purchase may be required); contact Daria Sakharova (GBA) or distribution@drexeltech.com for assistance.
Posted Date
Dec 3, 2025
Due Date
Dec 31, 2025
Release: Dec 3, 2025
Close:
Premium
Access the largest public sector contact database
The City of Raytown, MO (SWM-2025-03) is soliciting sealed bids for the GO Bond - Eastside Industrial District Storm Sewer Improvements project comprising new storm sewer construction, storm sewer repairs, CIPP lining, and manhole and inlet construction & rehabilitation. A non-mandatory Pre-Bid Conference and optional site visit will be held December 16, 2025 at 1:00 PM at Raytown City Hall; sealed bids are due December 31, 2025 at 2:00 PM and will be publicly opened the same day. Bidding documents and plans are distributed through Drexel Technologies' planroom (registration/login and purchase may be required); contact Daria Sakharova (GBA) or distribution@drexeltech.com for assistance.
AvailableReconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Reconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation.
Availablework includes the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
work includes the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
AvailableThis project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
Posted Date
Oct 20, 2025
Due Date
Jan 8, 2026
Release: Oct 20, 2025
Close: Jan 8, 2026
This project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis