Provide storm sewer improvements. Work includes improvements to existing storm drain, sanitary sewer, water infrastructure, and restoration. Storm drain improvements include removal and installation of storm drain inlets, manholes, pipe, rip-rap apron, couplings, pre-cast headwall and flared end section as well as coordination with Delmarva Gas. Sanitary sewer modifications include adjustments to existing and installation of new sanitary sewer gravity pipe and manholes, bypass pumping, cleanout installation and connection to existing laterals. Water improvements include installation of watermain, valves, connections to existing main, new water services with corporation and curb stops, and associated appurtenances. Excavation, backfill, bypass pumping, maintenance of traffic, testing, erosion and sediment control and all ancillary work for utility installations shall be incidental to bid items. Restoration work includes removal and replacement of curb, sidewalk, ADA ramps, striping, and mill overlay of roadway surface. See attached file.
Available