Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
LS Clearing Site; LS Soil Erosion and Sediment Control; 750 CY Excavation, Unclassified; 10 CY Excavation, Test Pit; 750 CY I-13 Soil Aggregate; 10 SY Riprap Outfall Protection, 12" Thick (D50 = 6" Thick); 2 CY Concrete Headwall; 20 SY Hot Mix Asphalt Driveway, 6" Thick; 100 SY Concrete Sidewalk, Reinforced, 6" Thick; 180 LF Concrete Vertical Curb, 9" x 18"; 480 SY HMA Milling, 3" or Less; 5 ton Hot Mix Asphalt 9.5M64 Surface Course, 2" Thick; 10 ton Hot Mix Asphalt 19M64 Base Course, 7" Thick; 90 sY Dense Graded Aggregate, Base Course, 8" Thick; 10 gal Tack Coat; 350 :F Polymerized Joint Adhesive ; 1 un Inlet, Type "B"; 54 LF of 18" RCP, Class V; 20 CY Dense Graded Aggregate, Backfill (for Pipe Trench); 1 un Reset Casting; 600 SF Vegetated Rockwall; 70 CY Gabion Basket; 72 LF Chain Link Fence, 6' High, PVC-Coated Steel; 16 UN Pipe Bollard 16; 350 SY Geomat; 700 SY Topsoil, 4" Thick; 1,400 SY Fertilizing and Seeding; 1,400 SY Straw Mulching; 7 un Red Willow 6' - 8', B&B; 7 un Boxelder 6' - 8', B&B; 15 UnScarlet Elder, 5 Gallon Pot; 12 un American Elderberry, 5 Gallon Pot; LS Cleaning and Restorations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of 30 cy of soft spot repair crushed aggregate base material, 60 LF of 12" storm drain/culvert/gravity irrigation pipe, class c900 pvc, 3 EA of catch basin, 1 EA of precast sediment box, 100 LF of standard 3" rolled curb & gutter, 280 LF of standard 6" vertical curb & gutter, 170 LF of concrete valley gutters, 55 SY of concrete sidewalks, 14 EA of pedestrian ramp, 200 SF of traffic control signs, 120 SF of pavement markings (thermoplastic), repair landscaping, 8,615 SY of asphalt repair, 20 SY of sod repair, 25 EA of trim tree, 100 LF of remove and reset sprinkler system.
Posted Date
Dec 2, 2025
Due Date
Dec 17, 2025
Release: Dec 2, 2025
Close: Dec 17, 2025
Project consists of 30 cy of soft spot repair crushed aggregate base material, 60 LF of 12" storm drain/culvert/gravity irrigation pipe, class c900 pvc, 3 EA of catch basin, 1 EA of precast sediment box, 100 LF of standard 3" rolled curb & gutter, 280 LF of standard 6" vertical curb & gutter, 170 LF of concrete valley gutters, 55 SY of concrete sidewalks, 14 EA of pedestrian ramp, 200 SF of traffic control signs, 120 SF of pavement markings (thermoplastic), repair landscaping, 8,615 SY of asphalt repair, 20 SY of sod repair, 25 EA of trim tree, 100 LF of remove and reset sprinkler system.
AvailableThe work generally includes, but is not limited to, providing all supervision, labor, material and equipment required to complete the removal of existing concrete sidewalk, installation of a structurally designed concrete sidewalk, installation of block retaining wall, installation of storm sewers, and repaving. Also includes 30 SY of Moment Slab Sidewalk and Curb with Toe Wall 4 Feet Below Sidewalk, Sta. 2+76 - 3+28 (Sidewalk Detail No. 1); 85 SY of Concrete Sidewalk with Integral Curb and Toe Wall 1 Foot Below Sidewalk. Sta. 3+68 - 5+28 (Sidewalk Detail No. 2). See outside link.
Posted Date
-
Due Date
Jan 23, 2026
Release: -
Close: Jan 23, 2026
The work generally includes, but is not limited to, providing all supervision, labor, material and equipment required to complete the removal of existing concrete sidewalk, installation of a structurally designed concrete sidewalk, installation of block retaining wall, installation of storm sewers, and repaving. Also includes 30 SY of Moment Slab Sidewalk and Curb with Toe Wall 4 Feet Below Sidewalk, Sta. 2+76 - 3+28 (Sidewalk Detail No. 1); 85 SY of Concrete Sidewalk with Integral Curb and Toe Wall 1 Foot Below Sidewalk. Sta. 3+68 - 5+28 (Sidewalk Detail No. 2). See outside link.
Sidewalk shed repair.
Posted Date
Dec 8, 2025
Due Date
Dec 30, 2025
Release: Dec 8, 2025
Close: Dec 30, 2025
Sidewalk shed repair.
AvailableSmall works roster - repair/replacement of sidewalk.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Small works roster - repair/replacement of sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis