Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Corps of Engineers, Galveston District, solicits competitive proposals for pipeline dredging and maintenance work along the Gulf Intracoastal Waterway from Corpus Christi Bay to Port Isabel with an additional channel to Harlingen, Texas. The procurement covers dredging operations across multiple South Texas counties (Nueces, Kleberg, Kenedy, Willacy, and Cameron) under NAICS 237990 and is unrestricted (no set-aside). Proposals are due May 22, 2026 and interested contractors should use the SAM.gov posting and PIEE links referenced by the original posting to access full solicitation documents and vendor access instructions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Oct 28, 2025
Close: May 22, 2026
Pipeline dredging.
AvailableFY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
Posted Date
Nov 10, 2025
Due Date
Aug 4, 2026
Release: Nov 10, 2025
Close: Aug 4, 2026
FY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
Pipeline Maintenance Dredging of the Matagorda Ship Channel. Schedule 1 includes dredging of approx. 1,738,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 1 thru 11. Option 1 includes dredging of approx.1,879,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 12 thru 22. Additional time of 108 calendar days. Option 2 includes dredging of approx.159,000 cubic yards (CY) of the Gulf Intracoastal Waterway, Sections 23 thru 24.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Pipeline Maintenance Dredging of the Matagorda Ship Channel. Schedule 1 includes dredging of approx. 1,738,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 1 thru 11. Option 1 includes dredging of approx.1,879,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 12 thru 22. Additional time of 108 calendar days. Option 2 includes dredging of approx.159,000 cubic yards (CY) of the Gulf Intracoastal Waterway, Sections 23 thru 24.
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis