Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the demolition of an existing water-cooled chiller and associated components, and installation of a new modular water-cooled chiller, new pumps, new BAS controls, and replacement of chilled water valves on rooftop units at Goochland High School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chiller replacement project.
Posted Date
Dec 9, 2025
Due Date
Jan 30, 2026
Release: Dec 9, 2025
Close: Jan 30, 2026
Chiller replacement project.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of the Mechanical/Electrical and General Construction work required to replace the existing air-cooled chiller located on grade within an enclosure and any pump and hydronic piping work shown and identified in the documents.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
The Project consists of the Mechanical/Electrical and General Construction work required to replace the existing air-cooled chiller located on grade within an enclosure and any pump and hydronic piping work shown and identified in the documents.
AvailableQuakertown Community School District is soliciting sealed bids for the Sixth Grade Center Chiller Replacement as a single-prime, lump-sum contract. Bids are due by 1:00 p.m. prevailing time on January 30, 2026, at the District Facilities Building, with a mandatory pre-bid meeting on January 15, 2026, at 11:00 a.m. Electronic bid documents are available via emailed link from CHA Solutions beginning December 23, 2025.
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
Quakertown Community School District is soliciting sealed bids for the Sixth Grade Center Chiller Replacement as a single-prime, lump-sum contract. Bids are due by 1:00 p.m. prevailing time on January 30, 2026, at the District Facilities Building, with a mandatory pre-bid meeting on January 15, 2026, at 11:00 a.m. Electronic bid documents are available via emailed link from CHA Solutions beginning December 23, 2025.
MSD of Warren Township seeks sealed bids to replace the central plant boilers and chiller at Highlander Park, including new boilers, a 160-ton air-cooled chiller, pumps, VFDs, piping, valves, electrical work, and related systems. The solicitation is an RFB (open) posted Jan 9, 2026 with bids due Feb 6, 2026 at 10:00 AM EST; a pre-bid site visit is scheduled for Jan 23, 2026 at 10:00 AM EST and questions are due Jan 28, 2026 at 4:00 PM EST. Bid documents and technical specifications are listed on the buyer's procurement portal (download requires portal login); primary document links are not publicly exposed without authentication.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
MSD of Warren Township seeks sealed bids to replace the central plant boilers and chiller at Highlander Park, including new boilers, a 160-ton air-cooled chiller, pumps, VFDs, piping, valves, electrical work, and related systems. The solicitation is an RFB (open) posted Jan 9, 2026 with bids due Feb 6, 2026 at 10:00 AM EST; a pre-bid site visit is scheduled for Jan 23, 2026 at 10:00 AM EST and questions are due Jan 28, 2026 at 4:00 PM EST. Bid documents and technical specifications are listed on the buyer's procurement portal (download requires portal login); primary document links are not publicly exposed without authentication.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →