Montachusetts Regional Transit Authority
Remove and dispose of the existing standby generator and to furnish, install, and commission a new diesel-powered generator system.
Matanuska Electric Association, Inc./MEA
Project called MEA Dispatch Generator Replacement. Construction and commissioning of a new 80kW, Diesel fired Generator and load bank to replace the existing 60kW, Natural Gas fired Generator along with all appurtenant civil, mechanical, and electrical improvements for the MEA Dispatch Center Facility. The existing ATS will be reused with the new generator, and the new generator must interface with the existing ATS controls. A temporary roll up generator must be provisioned and set up as a backup power source while the new generator is being installed.
Maryland Motor Vehicle Administration
The project involves the replacement of generators and automatic transfer switches (ats). Including selective demolition, removal of existing equipment, installation of new generators and ats, associated electrical and mechanical work, and restoration of affected areas.
North Slope Borough
Provide Districtwide Generator Replacement and Upgrades.
Release
Oct 13, 2025
Close
Nov 21, 2025