Summary
Work includes 1 LS lead and hazardous materials compliance plan; 1 LS erosion and dust control bmp's; 1 ls video sewer and storm drain; 1 LS clearing and grubbing; 1 EA monument preservation; 9 EA remove tree; 4 EA remove gate; 1 EA remove concrete headwall; 9 LF remove storm drain pipel 4 EA remove drainage inlet; 3 EA remove roadside sign (one-post); 5,230 LF remove concrete (curb); 2,800 LF remove concrete (curb and gutter); 1,800 SY remove concrete (flatwork); 28,400 SY cold planing ac pavement; 2,590 C roadway excavation; 240 CY unsuitable material; 260 SF decomposed granite; 150 CY aggregate base class 2. See attached file.