Summary
Project scope includes hvac equipment replacements and upgrades across five (5) buildings. The boilers and rooftop units will be replaced, and an additional chilled water pump will be provided at the cat building, and the chiller, boilers, and cooling tower will be replaced at the cam building. The chiller and boiler will be replaced, and the staged electric heating coil in the air handling unit will be replaced with a sccr heating coil at the ssc building, and the boilers will be replaced at the nurse and allied health building. At the urban metro campus, the transportation building will have destratification fans installed and controls upgrades. An add alternate includes envelope upgrades to a portion of offices and classrooms at the tie building.