The Project includes the following Work: • Preconstruction documentation of existing structures. • Demolition of a 2-story masonry building with a complete basement and attached drive-through canopy located at 102 and 104 North Broadway in Crookston, MN. • Site restoration consisting of backfill of the basement excavation and site grading, imported topsoil, grass seeding, asphalt pavement and aggregate base, and concrete sidewalk and aggregate base. • Independent testing agency quality control testing and special inspections. • 3rd party demolition phase vibration monitoring. • Construction phase traffic control on portions of US highway 2. Owner anticipates that the Project’s total bid price will be approximately $960,000.00. The Project must be Substantially complete at a date provided by the contractor in their bid (which shall not be later than May 7, 2027) with Final Completion no later than 21 days after the Contractors Substantial Completion date (which shall not be later than May 28, 2027). For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.