A47_2026 Smart Scale - Off Ramp Improvements
Work include 20 LF 30" pipe; 2,809 CY regular excavation; 1,214 LF temporary diversion dike; 425 CY siltation control excavation; 2,467 LF temp. Silt fence type a; 1,075 LF saw-cut asphalt concrete (full depth); 921 LF underdrain ud-4; 297 LF guardrail; 691 LF remove existing guardrail; 1,415 SY demo. Of pavement flexible; 938 LF traffic barrier service mb-11a; 1,307 LF temp. Pvmt mrkg ty. D, cl. Iii, 6"; 48 LF sign post stp-1, 2 1/2", 10 gauge; 2,424 LF 14/7 conductor cable.