Rossville Consolidated School District
School DistrictIN
Posted
Sep 9, 2026
Sep 22, 2026
High School Roof and Chiller Replacement RFP
High school roof and chiller replacement.
Description: Work includes : roof replacement: remove existing roofing and related accessories.
SchoolDistrict · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Rossville Consolidated School District
School DistrictIN
Posted
Sep 9, 2026
Sep 22, 2026
High school roof and chiller replacement.
CityPA
Posted
Sep 3, 2026
Sep 21, 2026
Generally includes: Removal and lawful disposal of existing EPDM roofing membrane asbestos containing materials, insulation, wood blocking, metal flashings roof drains and miscellaneous rooftop equipment, and the provision of new wood blocking, roof drains, tapered insulation and coverboard, EPDM roof membrane, metal flashings and miscellaneous other items.
California Department of General Services
State AgencyCA
Posted
Aug 28, 2026
Sep 23, 2026
Major components of Project Work consist of replacing roofing systems on five existing buildings. For the single-story, Armistice Chapel, with an approximate 2,100sf of roof area, the work includes removing the existing wood shakes roof system and installing new fire-retardant treated wood shakes, underlayment, new copper flashing, gutters, and downspouts to preserve historic architectural features
North Central Parke Community School Corporation
School DistrictIN
Posted
Aug 25, 2026
Sep 16, 2026
Roof Replacement at school.
Decision makers connected to this RFP from Galatia Community Unit School District 1.