Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installing approximately 950 linear feet of 6-inch dr 18 c900 pvc water main within the alley. Excavation, backfill, and compaction; installation of one fire hydrant; installation of twenty-one (21) 1-inch water service lines with reconnection to existing meters; tie-ins to existing water mains at 1st, 2nd, and 3rd streets; cutting and capping of the existing 2-inch water main; restoration of gravel roads and driveway approaches to their pre-construction condition; saw-cutting and replacement of asphalt in 2nd street; replace existing water meters as needed if damaged; any special construction at the water-sewer crossing; repair existing water and sewer mains as needed if damaged. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Waterline replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Waterline replacement.
AvailablePremium
Access the largest public sector contact database
Construction of the waterline replacement project.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
Construction of the waterline replacement project.
AvailableWork consists of street and alley rehabilitation.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Work consists of street and alley rehabilitation.
AvailableProject includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Project includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis