Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of McAllen
Work consists of street and alley rehabilitation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Allen
City of Allen (TX) Request for Bid for full construction services to rehabilitate streets and alleys per contract plans—furnish all materials, equipment, labor and appurtenances. Solicitation requires completed bid sheet with detailed pricing, bid bond (original required for apparent low bidder), performance/payment/maintenance bonds, certificate of insurance or affidavit, bidder qualifications, references, schedule of subcontractors, and other standard contract exhibits; electronic submission via the City eBid system and a pre-bid Teams meeting are provided.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
City of Allen
Close: Jan 8, 2026
City of Allen (TX) Request for Bid for full construction services to rehabilitate streets and alleys per contract plans—furnish all materials, equipment, labor and appurtenances. Solicitation requires completed bid sheet with detailed pricing, bid bond (original required for apparent low bidder), performance/payment/maintenance bonds, certificate of insurance or affidavit, bidder qualifications, references, schedule of subcontractors, and other standard contract exhibits; electronic submission via the City eBid system and a pre-bid Teams meeting are provided.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Jefferson County
Rehabilitation of approx. 859 sanitary sewer service laterals with cured-in-place liner, replacement of 172 laterals with excavation, 12,838 LF of 8" and 12" mainline cured-in-place liner, 756 vertical feet of manhole rehabilitation, 27 internal sectional liners, 636 LF of 8" sanitary sewer replacement, asphalt paving and restoration work.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Jefferson County
Close: Dec 17, 2025
Rehabilitation of approx. 859 sanitary sewer service laterals with cured-in-place liner, replacement of 172 laterals with excavation, 12,838 LF of 8" and 12" mainline cured-in-place liner, 756 vertical feet of manhole rehabilitation, 27 internal sectional liners, 636 LF of 8" sanitary sewer replacement, asphalt paving and restoration work.
AvailableCity of Laramie
Work includes approx 123,500 SY rotomill and haul asphalt; 1,418.5 SY removed and dispose of concrete flatwork; 123.50 SY crushed based(12") type W; 116,900 SY plant mix bituminous pavement(depth (4"), 1/2 City mix); 3,906 LF highback curb and gutter; 1 EA single storm sewer inlet and catch basin; 123 EA ADE ramp; See outside link.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
City of Laramie
Close: Jan 13, 2026
Work includes approx 123,500 SY rotomill and haul asphalt; 1,418.5 SY removed and dispose of concrete flatwork; 123.50 SY crushed based(12") type W; 116,900 SY plant mix bituminous pavement(depth (4"), 1/2 City mix); 3,906 LF highback curb and gutter; 1 EA single storm sewer inlet and catch basin; 123 EA ADE ramp; See outside link.
AvailableCity of Westerville
Work includes pavement reconstruction including concrete curbing and underdrain replacement, concrete curb ramps and sidewalk, storm drainage structure replacement, waterline and services and other appurtenant work.
Posted Date
-
Due Date
Dec 20, 2025
Release: -
City of Westerville
Close: Dec 20, 2025
Work includes pavement reconstruction including concrete curbing and underdrain replacement, concrete curb ramps and sidewalk, storm drainage structure replacement, waterline and services and other appurtenant work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →