Retrieving RFP details
Release
Close
City of Oklahoma City
Waterline replacement.
Town of Poolesville
Work consist of involves the replacement of approx. 25,000 LF of water line and connecting to the existing laterals that are connected to the existing water main. Patching of the excavated sections of roadway and stabilization of grass areas as needed.
Cawood Water District
Project consists of replacing approx 5,750 LF of 8" and 3" waterline, one pressure reducing station, and all necessary appurtenances.
City of Seagoville
Provide replacement of 1,300 LF of 8" waterline with a 18" PVC waterline. The new water line will begin at the ard road pump station and terminate at the seagoville road intersection.
Release
Nov 05, 2025
Close
Dec 17, 2025