Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Department of Veterans Affairs (West Palm Beach VA Medical Center) is soliciting contractors to remove and replace cabinets and flooring in the OR Sub-Sterile Rooms at the West Palm Beach VA Medical Center. The procurement requires full labor, materials, tools, and equipment, compliance with infection control and safety regulations, and submission of technical and price proposals; the project is expected to take 90 days. Site visit and pre-bid activities are scheduled in January 2026 and proposals are due in February 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
All the work area should be sealed using two layers of 0.15 millimeters 6 mil poly (IHFOM, CH 13, Sec. 3), and negative pressure containment shall be installed by the contractor prior to start of demolition work and shall remain for the duration of the project, exhausting to the nearest outside exterior window. The contractor shall cover all vents from the area of construction. Demolition: The contractor shall remove existing vinyl flooring, approx. 123 SF in 2A-211A, and 99 SF in 2A-207A from the sub-sterile rooms. The contractor shall remove 2 bottom cabinets in 2A-207A (1 sink cabinet 42” x 24” x 36” and 1 cabinet 48” x 24” x 36”), and 2 top cabinets (one 42” x 16” x 49” and the other 48” x 16” x 49”) and remove countertop approx. 95” x 24”. The contractor shall remove a large sink approx. 3 ft. with no cabinets (see attached picture IMG_0562 for reference) from 2A-211A, this sink is to be removed and preserved, provide to FMS staff. See attached file.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
All the work area should be sealed using two layers of 0.15 millimeters 6 mil poly (IHFOM, CH 13, Sec. 3), and negative pressure containment shall be installed by the contractor prior to start of demolition work and shall remain for the duration of the project, exhausting to the nearest outside exterior window. The contractor shall cover all vents from the area of construction. Demolition: The contractor shall remove existing vinyl flooring, approx. 123 SF in 2A-211A, and 99 SF in 2A-207A from the sub-sterile rooms. The contractor shall remove 2 bottom cabinets in 2A-207A (1 sink cabinet 42” x 24” x 36” and 1 cabinet 48” x 24” x 36”), and 2 top cabinets (one 42” x 16” x 49” and the other 48” x 16” x 49”) and remove countertop approx. 95” x 24”. The contractor shall remove a large sink approx. 3 ft. with no cabinets (see attached picture IMG_0562 for reference) from 2A-211A, this sink is to be removed and preserved, provide to FMS staff. See attached file.
Available26-21 Removal & Replacement of Fuel Storage Tank.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
26-21 Removal & Replacement of Fuel Storage Tank.
AvailableProject consists of Town Hall Elevator Replacement - Filed Sub Bids for Electrical
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
Project consists of Town Hall Elevator Replacement - Filed Sub Bids for Electrical
AvailableDemolition and removal of existing structures, and furnish labor and materials and perform work.
Posted Date
Sep 2, 2025
Due Date
Mar 16, 2026
Release: Sep 2, 2025
Close: Mar 16, 2026
Demolition and removal of existing structures, and furnish labor and materials and perform work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis