CityCA
Posted
Nov 12, 2026
Dec 4, 2026
Construction of Zone 4 Curb Ramp Installation RFP
Construction of Zone 4 Curb Ramp Installation.
Description: Removal and construction of twenty-four (24) ADA-compliant curb ramps at various locations throughout the city, including associated curb, gutter, sidewalk transition panels, detectable warning surfaces, minor pavement restoration, and all related work.
City · CA, US
Adjacent opportunities open for bidding right now.
CityCA
Posted
Nov 12, 2026
Dec 4, 2026
Construction of Zone 4 Curb Ramp Installation.
CityNJ
Posted
-
Dec 2, 2026
Rehabilitation of 17 ADA-accessible curb ramps at eight intersections, including replacement of curbs, sidewalks, aprons and ramps, inlet castings, traffic signs, and striping.
California Department of Transportation
State AgencyCA
Posted
Sep 28, 2026
Dec 8, 2026
4,580 CY roadway excavation; 1,440 SF gravel mulch; 73 LF 8" corrugated high density polyethylene pipe conduit.
California Department of Transportation
State AgencyCA
Posted
Oct 12, 2026
Dec 9, 2026
Portable radar speed feedback sign system; street sweeping; 1,340 CY roadway excavation; 5.1 CY (f) - structure backfill (slurry cement); 810 CY class 2 aggregate base (cy).
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Monterey Park.