Posted
Aug 3, 2026
Sep 2, 2026
San Rafael Creek and ATF FY26 Maintenance Dredging
The work includes maintenance dredging of the creek channel to 6' (MLLW) plus 1' of paid over-depth and the across the flats (ATF) channel to -8' (MLLW) plus 1' of paid over-depth and transporting of the dredged material per the requirements.