Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The replacement work for a sally port door.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project scope includes but is not limited to the following: complete demolition of existing sally port wall and footing; sawcutting and removal of existing concrete pavement; construction of new sally port walls and footings; construction of new automated sliding gate; installation of new power and control wiring; replacement of existing concrete pavement.
Posted Date
Nov 6, 2025
Due Date
Dec 30, 2025
Release: Nov 6, 2025
Close: Dec 30, 2025
Project scope includes but is not limited to the following: complete demolition of existing sally port wall and footing; sawcutting and removal of existing concrete pavement; construction of new sally port walls and footings; construction of new automated sliding gate; installation of new power and control wiring; replacement of existing concrete pavement.
Premium
Access the largest public sector contact database
Professional architectural/engineering design services to replace two sally port gates at FDCF (Fort Dodge, IA), including evaluation of increasing gate height and width. Scope includes surveys, full design and construction documents, staged cost opinions, bidding assistance, construction administration (minimum 10 site visits plus unit price per additional inspections), and deliverables via the State construction management software; fee requested as a lump-sum with breakdowns.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
Professional architectural/engineering design services to replace two sally port gates at FDCF (Fort Dodge, IA), including evaluation of increasing gate height and width. Scope includes surveys, full design and construction documents, staged cost opinions, bidding assistance, construction administration (minimum 10 site visits plus unit price per additional inspections), and deliverables via the State construction management software; fee requested as a lump-sum with breakdowns.
Procurement for the construction of a new water main, including plumbing, earthwork, trenching, backfill, and directional drilling, for the Port Byron Service Area at I-90, Milepost 310.20 (Contract TAS 26-10A / D215078).
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Procurement for the construction of a new water main, including plumbing, earthwork, trenching, backfill, and directional drilling, for the Port Byron Service Area at I-90, Milepost 310.20 (Contract TAS 26-10A / D215078).
AvailableBid for art supplies items include but not limited to: construction paper glue scissors paint crayons, markers, colored pencils, etc.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Bid for art supplies items include but not limited to: construction paper glue scissors paint crayons, markers, colored pencils, etc.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis