CityCA
Posted
Sep 10, 2026
Oct 14, 2026
Sidewalk Repair Program Package No. 89 (LA 28)
715 CY excavation; 36,752 SF 4" sidewalk and driveway; 109 LF concrete curb; 1,579 LF concrete curb and gutter; 7,151 SF 6" driveway and sidewalk.
Description: The City of Houston is soliciting bids under reference number CB-2026-0058 for its FY2026 Sidewalk Program Work Order Package #1. Houston Public Works seeks construction services for new and rehabilitated sidewalks, driveway reconstruction, median modifications, pavement markings, signage, wheelchair ramps, curbs, walkways, and pedestrian crossings at individual work-order locations. The posting is an active construction IFB/E-BID rather than a grant program, with bids due October 15, 2026 at 10:00 AM CDT.
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Houston.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Sep 10, 2026
Oct 14, 2026
715 CY excavation; 36,752 SF 4" sidewalk and driveway; 109 LF concrete curb; 1,579 LF concrete curb and gutter; 7,151 SF 6" driveway and sidewalk.
CityCA
Posted
Sep 3, 2026
Sep 30, 2026
Work includes 10 EA portable changeable message signs; 14 EA construction funding signs; 1 LS erosion and dust control bmps; 1 LS pothole existing utilities; 1 LS video sewer and storm drain video; 2,398 CY roadway excavation (f); 53,082 sy cold plane asphalt concrete pavement; 231 CY unsuitable material; 4,905 LF remove concrete curb & gutter; 15,546 SF remove concrete flatwork; 1 EA remove water curb stop valve box and cover; 2 EA remove tree/hedge; 14,905 ton hma (type a); 37,125 SY full depth reclamation-cement; 1,126 ton cement (full-depth reclamation- cement); 2,426 LF slurry backfill over shallow utility. See attached file.
CityWI
Posted
Sep 8, 2026
Sep 30, 2026
The work includes approx 3,200 SF of concrete sidewalk replacement along with erosion control, traffic control, root cutting, grass restoration, cleanup, and related miscellaneous construction
CityNJ
Posted
Sep 6, 2026
Sep 23, 2026
5,360 concrete sidewalk repair located throughout the township. Alternate Bid no. 1 640 SF concrete sidewalk repair located throughout the township.