Posted
Sep 11, 2026
Oct 6, 2026
FY 26/27 Annual Concrete Repair
Work consist of 3,100 SF remove and construct 4" PCC sidewalk per ocpw standard plan 1205; 120 LF remove and construct PCC curb and gutter per sppwc standard plan 120-2
Description: FY 26-27 Utilities Annual Supply Bid. 3/4" Brass Compression Coupling; 3/4" Brass Compression 90; 314" x3l4" x 3/4" Brass Compression Tee; 3l4" x2" Brass Nipple; 2" Brass Gate Valve (Female x Female); 3/4" Brass Angle Curb Stop; 2" Brass CC Corporation; 1-112" Ultrasonic Water Meter, potted with ltron Male Connector; 314" x 1116" Fiber Water Meter Gasket.
City · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Sep 11, 2026
Oct 6, 2026
Work consist of 3,100 SF remove and construct 4" PCC sidewalk per ocpw standard plan 1205; 120 LF remove and construct PCC curb and gutter per sppwc standard plan 120-2
North Carolina Division of Mitigation Services
State AgencyNC
Posted
Jun 2, 2026
Apr 29, 2027
Procurement of weatherization services, including general contracting, HVAC, electrical, plumbing, energy auditing, NEAT/MHEA, and quality control final inspections, for homes in Anson, Bladen, Brunswick, Columbus, Cumberland, Hoke, Montgomery, Moore, Pender, Richmond, Robeson, Sampson, and Scotland Counties, North Carolina.
Clark County Water Reclamation District (CCWRD)
Special DistrictNV
Posted
Sep 1, 2026
Oct 8, 2026
The work may consist of 12 EA 4" - 6" pvc lateral connections, 600 LF install 4" - 6" pvc lateral, 0 to 6" deep [after main connection], 60 EA install 4" - 6" serviceconnection liner, 900 LF provide 8"-10 pvc sewer pipe, 0 to 6" deep, 3 EA rehabilitate 48 manhole w/corrosion protection 0" to 6" deep, 18 EA remove and replace manhole frame and cover, 30 EA bypass - laterals 4" - 6". See outside link.
CountyCA
Posted
Sep 16, 2026
Sep 24, 2026
The County of Kern is soliciting bids for the planting of Rainbow and Golden Rainbow (Lightning) Trout at Lake Evans in the Buena Vista Recreational Area. The work involves scheduled plantings beginning near the end of November and continuing with approximately two plantings per month from December through April, with the County preferring one vendor but allowing split awards. Bidders must provide pricing per pound, include all labor, materials, equipment, and fees, and submit the completed quotation request form with their response.
Decision makers connected to this RFP from City of Farmers Branch.