CityGA
Posted
Sep 11, 2026
Oct 14, 2026
FY 2027 Park Street Drainage Repair Project
The City of Walnut Grove is soliciting construction bids to replace a damaged culvert under Industrial Parkway and regrade and stabilize ditch sections along Park Street. The work includes installing a larger 30-inch RCP culvert with GDOT end sections, foundation backfill, paving, erosion controls, grassing, and sod. Industrial Parkway may be closed for up to three days during construction, and the solicitation is an active construction procurement rather than a grant program.