Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to excavate the alum drying beds located at our water treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of construction services for the 2026 Pond Maintenance Project, including clearing, grubbing, pond and channel excavation, riprap installation, erosion prevention, and seeding.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Procurement of construction services for the 2026 Pond Maintenance Project, including clearing, grubbing, pond and channel excavation, riprap installation, erosion prevention, and seeding.
AvailablePremium
Access the largest public sector contact database
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1 LS Clearing and Grubbing; 930 CY Excavation – Channel and Pond (LV); 380 C Y Excavation Channel and Pond (LV) (Special); 670 TON Excavation Channel and Pond (Special); 20 CY Random Riprap Class III (Fieldstone); 1,420 SY Rolled Erosion Prevention Category 20; 0.4 ACRE Seeding.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1 LS Clearing and Grubbing; 930 CY Excavation – Channel and Pond (LV); 380 C Y Excavation Channel and Pond (LV) (Special); 670 TON Excavation Channel and Pond (Special); 20 CY Random Riprap Class III (Fieldstone); 1,420 SY Rolled Erosion Prevention Category 20; 0.4 ACRE Seeding.
AvailableApprox 5 each clearing & grubbing; 3 each remove pipe apron; 2260 CY excavation - channel and pond (LV); 810 CY excavation - channel and pond (LV); (special); 2 each 24" gs pipe apron; 40 CY random riprap class III (fieldstone); 0.3 acre seeding;
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Approx 5 each clearing & grubbing; 3 each remove pipe apron; 2260 CY excavation - channel and pond (LV); 810 CY excavation - channel and pond (LV); (special); 2 each 24" gs pipe apron; 40 CY random riprap class III (fieldstone); 0.3 acre seeding;
AvailableCity of Alpena requests proposals for 2026 excavation services: water and sewer excavation including removal/replacement of water services for Lead & Copper compliance, emergency repairs, and replacement of water and sewer mains and services. Bidders must furnish labor, equipment, materials, hourly rate sheets and unit/unit pricing, a Contractor's Qualification Statement, required bonds and insurance, and attend a mandatory onsite pre‑proposal meeting. The city may award multiple contracts and assign emergency work based on contractor availability.
Posted Date
Dec 2, 2025
Due Date
Dec 16, 2025
Release: Dec 2, 2025
Close: Dec 16, 2025
City of Alpena requests proposals for 2026 excavation services: water and sewer excavation including removal/replacement of water services for Lead & Copper compliance, emergency repairs, and replacement of water and sewer mains and services. Bidders must furnish labor, equipment, materials, hourly rate sheets and unit/unit pricing, a Contractor's Qualification Statement, required bonds and insurance, and attend a mandatory onsite pre‑proposal meeting. The city may award multiple contracts and assign emergency work based on contractor availability.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis