Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope of work includes milling and resurfacing of roadways and ADA curb ramps. The project is comprised of an approx. Total of the following items of work: 14,750 sy of milling; 14,750 sy of superpave mixture wearing course overlay; 120 TN of superpave mixture leveling course; 250 sy of superpave mixture base repair; 500 lf of 4" waterborne pavement markings; 250 lf of 24" waterborne pavement markings; 38 ADA compliant curb ramp corners- design build; 8" reinforced concrete driveway; maintenance and protection of traffic; mobilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Close: Feb 3, 2026
2026 ADA - funded curb ramp replacement project.
AvailableProject work consists of ADA curb ramp improvements at various locations.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Project work consists of ADA curb ramp improvements at various locations.
AvailableWork associated with mobilizing, traffic control, water pollution control, surveying, sawcut, demolition, concrete work including curb, gutter, sidewalk, curb ramps, truncated domes, asphalt patching,, utility lowering and raising.
Posted Date
-
Due Date
Feb 11, 2026
Release: -
Close: Feb 11, 2026
Work associated with mobilizing, traffic control, water pollution control, surveying, sawcut, demolition, concrete work including curb, gutter, sidewalk, curb ramps, truncated domes, asphalt patching,, utility lowering and raising.
Availablehis project consists of ADA curb ramp construction, miscellaneous curb repair and curb inlet top replacement. Approx 500 SY Repair pavement - large area (type OPW 3500); 500 SY repair pavement - small area (type OPW 3500); 300 SY repair Driveway; etc. See attached file.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
his project consists of ADA curb ramp construction, miscellaneous curb repair and curb inlet top replacement. Approx 500 SY Repair pavement - large area (type OPW 3500); 500 SY repair pavement - small area (type OPW 3500); 300 SY repair Driveway; etc. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis