Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
± 2,750 SY HMA Milling, Variable Depth; ± 375 TON Hot Mix Asphalt 9.5M64-10R Surface Course, 2" Thick; ± 750 TON Hot Mix Asphalt 19M64 Base Course, 4" Thick; ± 570 SY Concrete Sidewalk, 4” Thick; ± 1,950 LF if 6"x8"x18" Concrete Vertical Curb
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work includes milling and paving, HMA profile milling, full depth pavement repair, upgrading bicycle safe grates/eco curb pieces, drainage improvements, as well as other improvements depicted within the Construction Plans. Alternate Bid ‘A' consists of installation of 24” precast polymer concrete trench drain at the intersection of Studio Road and Day Avenue.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
The work includes milling and paving, HMA profile milling, full depth pavement repair, upgrading bicycle safe grates/eco curb pieces, drainage improvements, as well as other improvements depicted within the Construction Plans. Alternate Bid ‘A' consists of installation of 24” precast polymer concrete trench drain at the intersection of Studio Road and Day Avenue.
Premium
Access the largest public sector contact database
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
AvailableThe City of Monroe, LA issued an Invitation for Bids titled 'Water System Improvements - Thomas Avenue / Georgia Street Intersection' to construct water distribution improvements at the Thomas Ave / Georgia St intersection. The Bid Banana listing and multiple buyer/marketplace sources show the opportunity opened on 2025-12-08 and closes on 2026-01-08, with bids due January 8, 2026 (bid reception listed at 1:45 PM local time). Contract documents are distributed through the City’s purchasing resources and Volkert Engineering / QuestCDN (Quest posting is password-protected), and the solicitation is a construction procurement (not a grant).
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
The City of Monroe, LA issued an Invitation for Bids titled 'Water System Improvements - Thomas Avenue / Georgia Street Intersection' to construct water distribution improvements at the Thomas Ave / Georgia St intersection. The Bid Banana listing and multiple buyer/marketplace sources show the opportunity opened on 2025-12-08 and closes on 2026-01-08, with bids due January 8, 2026 (bid reception listed at 1:45 PM local time). Contract documents are distributed through the City’s purchasing resources and Volkert Engineering / QuestCDN (Quest posting is password-protected), and the solicitation is a construction procurement (not a grant).
AvailableWork includes 50 CY removal and disposal of unsuitable material; 5.4 CY trench backfill; 614 unit supplemental watering' 962 sy subbase granular material, type a 4"; 228 ton subbase granular material, type c; 88 pound bituminous materials (tack coat); 44 ton hot-mix asphalt surface course, il- 9.5, mix "d", n50; 146 SY portland cement concrete pavement 7" (jointed); 712 SY portland cement concrete pavement 8" (jointed); 923 SY protective coat; 2,747 SF portland cement concrete sidewalk 4"; 1,047 SY pavement removal; 392 SY hot-mix asphalt surface removal, 2"; 4 CY concrete structures; 2 LF storm sewer removal 12". See attached file.
Posted Date
Feb 20, 2025
Due Date
Dec 18, 2025
Release: Feb 20, 2025
Close: Dec 18, 2025
Work includes 50 CY removal and disposal of unsuitable material; 5.4 CY trench backfill; 614 unit supplemental watering' 962 sy subbase granular material, type a 4"; 228 ton subbase granular material, type c; 88 pound bituminous materials (tack coat); 44 ton hot-mix asphalt surface course, il- 9.5, mix "d", n50; 146 SY portland cement concrete pavement 7" (jointed); 712 SY portland cement concrete pavement 8" (jointed); 923 SY protective coat; 2,747 SF portland cement concrete sidewalk 4"; 1,047 SY pavement removal; 392 SY hot-mix asphalt surface removal, 2"; 4 CY concrete structures; 2 LF storm sewer removal 12". See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.