Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Springfield
Work includes 50 CY removal and disposal of unsuitable material; 5.4 CY trench backfill; 614 unit supplemental watering' 962 sy subbase granular material, type a 4"; 228 ton subbase granular material, type c; 88 pound bituminous materials (tack coat); 44 ton hot-mix asphalt surface course, il- 9.5, mix "d", n50; 146 SY portland cement concrete pavement 7" (jointed); 712 SY portland cement concrete pavement 8" (jointed); 923 SY protective coat; 2,747 SF portland cement concrete sidewalk 4"; 1,047 SY pavement removal; 392 SY hot-mix asphalt surface removal, 2"; 4 CY concrete structures; 2 LF storm sewer removal 12". See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Seattle
Construct a pedestrian plaza on Thomas Street between Fifth Avenue North and Taylor Avenue North including new sidewalk, pavement, channelization, signals, drainage, and landscaping. Work also includes rebar installation and electrical.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
City of Seattle
Close: Dec 17, 2025
Construct a pedestrian plaza on Thomas Street between Fifth Avenue North and Taylor Avenue North including new sidewalk, pavement, channelization, signals, drainage, and landscaping. Work also includes rebar installation and electrical.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Wake Forest
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Town of Wake Forest
Close: Dec 17, 2025
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
AvailableCity of Cumberland
The City of Cumberland is soliciting bids for the Mechanic Street and Harrison Street Intersection Improvements (City Project 2024-06-PVG), covering sidewalk, paving, crosswalk upgrades and installation of a new traffic signal. A mandatory pre-bid meeting is scheduled for 2025-11-20; bids close on 2025-12-17 and the project requires Performance and Payment Bonds.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
City of Cumberland
Close: Dec 17, 2025
The City of Cumberland is soliciting bids for the Mechanic Street and Harrison Street Intersection Improvements (City Project 2024-06-PVG), covering sidewalk, paving, crosswalk upgrades and installation of a new traffic signal. A mandatory pre-bid meeting is scheduled for 2025-11-20; bids close on 2025-12-17 and the project requires Performance and Payment Bonds.
AvailableCity of Fort Worth
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
City of Fort Worth
Close: Dec 4, 2025
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.