Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing of manhole/catch basin frames and covers for the sewer maintenance and highway departments for the 2026 calendar year.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Purchase of inmate clothing and other items for 2026 calendar year.
Posted Date
Jan 5, 2026
Due Date
Jan 21, 2026
Release: Jan 5, 2026
Close: Jan 21, 2026
Purchase of inmate clothing and other items for 2026 calendar year.
AvailableProject consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableIncludes the furnishing of all labor, materials and equipment necessary or required to complete all work set forth in the contract documents and provide turfgrass and stormwater detention basin maintenance for approx. 60 stormwater detention basins, open space lots or median islands located throughout Township, between February, 2026 and December 31, 2026 (mow, mulch, prune, clean etc.).
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Includes the furnishing of all labor, materials and equipment necessary or required to complete all work set forth in the contract documents and provide turfgrass and stormwater detention basin maintenance for approx. 60 stormwater detention basins, open space lots or median islands located throughout Township, between February, 2026 and December 31, 2026 (mow, mulch, prune, clean etc.).
AvailableFurnishing of various roadway materials.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Furnishing of various roadway materials.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis