Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish new 3" raised floor for npt 3rd floor conversion project. Quantity is 1500 SF with (2) 4' access ramps and border fascia. Floor to be installed by force account global IFS teccrete 1250 3" floor (bare).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The overall scope of this project is to provide a new 18” high raised access floor system (+/- 2,982 SF) and SRG in the Control Wing Basement at ZDV. (2) new ADA compliant ramps and stairs will be provided to access the new raised access floor. A new 9’-6” partition will be constructed to enclose the new raised access floor system. The existing nonconforming east door will be removed, and a new door will be provided within a new 2-hour rated alcove.
Posted Date
Dec 1, 2025
Due Date
Jan 28, 2026
Release: Dec 1, 2025
Close: Jan 28, 2026
The overall scope of this project is to provide a new 18” high raised access floor system (+/- 2,982 SF) and SRG in the Control Wing Basement at ZDV. (2) new ADA compliant ramps and stairs will be provided to access the new raised access floor. A new 9’-6” partition will be constructed to enclose the new raised access floor system. The existing nonconforming east door will be removed, and a new door will be provided within a new 2-hour rated alcove.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Tee, Branch 1/4" Npt X 3/8" Tube.
Posted Date
Jan 20, 2026
Due Date
Jan 28, 2026
Release: Jan 20, 2026
Close: Jan 28, 2026
Tee, Branch 1/4" Npt X 3/8" Tube.
Available1 EA Honeywell model# v8943b1010 1" npt diaphragm gas valve, single stage pressure regulating, slow opening.
Posted Date
Jan 23, 2026
Due Date
Jan 28, 2026
Release: Jan 23, 2026
Close: Jan 28, 2026
1 EA Honeywell model# v8943b1010 1" npt diaphragm gas valve, single stage pressure regulating, slow opening.
AvailableProvide floor, body, vehicular, NSN 2510015256325, Qty 10 UI KT
Posted Date
Jan 22, 2026
Due Date
Feb 2, 2026
Release: Jan 22, 2026
Close: Feb 2, 2026
Provide floor, body, vehicular, NSN 2510015256325, Qty 10 UI KT
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →