CityOH
Posted
-
Dec 1, 2026
Redhill Water Tower & Reservoir Fencing Replacement RFP
Tower & reservoir fencing replacement.
Description: Removal, disposal, and installation of a new standpipe at their water tower. The standpipe to be removed is a 24" insulated, concrete-lined ductile iron pipe (DIP). The length of pipe to be replaced and installed is approx. 125' (the contractor shall determine the exact length) and shall be like-in-kind to the existing standpipe.
City · OH, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
-
Dec 1, 2026
Tower & reservoir fencing replacement.
Lehigh Northampton Airport Authority
Special DistrictPA
Posted
Oct 13, 2026
Nov 13, 2026
One-for-one replacement of an existing roof-mounted cooling tower and replacement of the associated screen wall system. Repairs to the existing roof top mechanical penthouse including man door replacement, removal of existing wall louver, and structural repairs are also included. Additionally, the replacement of an existing IT room air conditioning split system is to be provided. See paragraph GI-1.04 for additional description.
CountyNC
Posted
Oct 9, 2026
Nov 10, 2026
The CCOB Cooling Tower Replacement Project, at which time and place Bids will be opened and read aloud. Single-prime, lump sum bids will be taken for the construction project as indicated in the bidding documents.
Ohio Department of Public Safety
State AgencyOH
Posted
-
Nov 10, 2026
Provide coated hot water basins and coated galvanized steel cooling tower panels and structural members.
Decision makers connected to this RFP from City of Lorain.