Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes HVAC, open space enclosure and roof replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Board of Education of Baltimore County (Baltimore County Public Schools) issued Solicitation GDA-309-26 for HVAC replacement and open space enclosure renovation at Sandalwood Elementary School. The work includes installation of new HVAC systems, renovation of existing structures, and compliance with prevailing wage and MBE participation requirements; the project estimate is $10,000,000 - $15,000,000. The solicitation is a public notice with a pre-bid teleconference and an estimated bid due date of 2026-01-15.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Close: Jan 15, 2026
Premium
Access the largest public sector contact database
The Board of Education of Baltimore County (Baltimore County Public Schools) issued Solicitation GDA-309-26 for HVAC replacement and open space enclosure renovation at Sandalwood Elementary School. The work includes installation of new HVAC systems, renovation of existing structures, and compliance with prevailing wage and MBE participation requirements; the project estimate is $10,000,000 - $15,000,000. The solicitation is a public notice with a pre-bid teleconference and an estimated bid due date of 2026-01-15.
This project proposes to renovate and rehabilitate the existing roof structure of The San Diego Air & Space Museum. The proposed work includes the repainting of the building's exterior; repair or replacement of existing exterior cement plaster system, sheet metal fins, roof drains, and roof piping including some drainage piping that is below grade; removal and replacement of the existing donut-shaped lower roof's roofing system; re-coating of the existing tower/rotunda roofing system; replacement of fin lighting and roof screen wall lighting; and installation of new interior ladders and roof opening guards at existing roof hatches.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
This project proposes to renovate and rehabilitate the existing roof structure of The San Diego Air & Space Museum. The proposed work includes the repainting of the building's exterior; repair or replacement of existing exterior cement plaster system, sheet metal fins, roof drains, and roof piping including some drainage piping that is below grade; removal and replacement of the existing donut-shaped lower roof's roofing system; re-coating of the existing tower/rotunda roofing system; replacement of fin lighting and roof screen wall lighting; and installation of new interior ladders and roof opening guards at existing roof hatches.
AvailableComplete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
Posted Date
-
Due Date
Jan 19, 2026
Close: Jan 19, 2026
Complete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
AvailableRelease: Dec 3, 2025
Close: Jan 13, 2026
Provide roof replacement work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis