University Of California Berkeley
Higher EducationCA
May 15, 2026
Closes
Sep 29, 2026
FS Zellerbach Hall Mezzanine Flooring Replacement (Advertisement for Bids) *Re-Bid*
Work consists of remove existing wood parquet flooring and install new ceramic mosaic tile flooring. Work includes demolition of existing flooring, substrate preparation, crack isolation membrane, self-leveling compound, and installation of new ceramic mosaic tile (OFCI) with associated trim and grout.