Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. General Services Administration seeks a contractor to replace the compressor of the cafeteria walk-in freezer at the IRS building in Fresno, CA. The contract is firm fixed price with a 90-calendar-day period of performance from Notice to Proceed and requires refrigerant recovery, removal of failed compressor, new hook-ups, leak testing, and proper disposal. A mandatory site visit/pre-bid meeting is scheduled for 2026-01-14 and proposals close on 2026-01-26.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
To replace the compressor of the cafeteria walk-in freezer.
Posted Date
Dec 29, 2025
Due Date
Jan 26, 2026
Release: Dec 29, 2025
Close: Jan 26, 2026
To replace the compressor of the cafeteria walk-in freezer.
AvailableCooler/ Freezer Replacement.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Cooler/ Freezer Replacement.
AvailableReplacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Replacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
AvailableThe project consists of walk-in cooler and freezer replacement along with related mechanical, plumbing, electrical, fire suppression and general construction renovations.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of walk-in cooler and freezer replacement along with related mechanical, plumbing, electrical, fire suppression and general construction renovations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis