Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for K-12 French immersion teachers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
RFP for a 0.5 FTE Senior Years French Immersion Teacher for a term contract.
Posted Date
Jan 8, 2026
Due Date
Jan 14, 2026
Release: Jan 8, 2026
Close: Jan 14, 2026
RFP for a 0.5 FTE Senior Years French Immersion Teacher for a term contract.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking for french and spanish instructional materials for secondary schools.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
Seeking for french and spanish instructional materials for secondary schools.
AvailableThe Limestone District School Board is seeking applications for Elementary Contract (Permanent) French Teachers.
Posted Date
-
Due Date
Mar 15, 2026
Close: Mar 15, 2026
The Limestone District School Board is seeking applications for Elementary Contract (Permanent) French Teachers.
AvailableDemolition and site preparation for proposed project items; including land clearing, tree and vegetation removal, and rough grading, per the plan drawings and specifications. Material purchase and installation of the river access grading, including rip-rap slope; per the plan drawings and specification. Material purchase and installation of the Main Park Sign, per the plan drawings and specifications. Material purchase and installation of the Directional Signs, per the plan drawings and specifications. Material purchase and installation of Split Rail Fence, including footings, stain and sealer, per the plan drawings and specifications. Material purchase and installation of River Access Concrete Lattice Ramp with concrete curb surround, per the plan drawings and specifications. Material purchase and installation of the 10’ wide Precast or Cast In Place Concrete River Access Ramp, per the plan drawings and specifications. Material purchase and installation of the 20’x40’ wide Precast or Cast In Place Non-motorized Boat Launch, per the plan drawings and specifications. Material purchase and installation of the Temporary Road to be revegetated, per the plan drawings and specifications. Material purchase and installation of the Entrance Sign; per the plan drawings and specifications. Material purchase and installation of the River Sign; per the plan drawings and specifications. Material purchase and installation of the Rule Sign; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #1, including pipe #1, apron# 1, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #2, including pipe #2, apron# 2, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of the Lattice Concrete Parking, including wheel stops, per the plan drawings and specifications. Material purchase and installation of the Concrete ADA Parking Area, Concrete Walkway, Sign, Paint, and Precast Vehicle Wheel Stops, per the plan drawings and specifications. Material purchase and installation of the Composting Restroom, per the plan drawings and specifications. Material purchase and installation of the Kayak Rack; per the plan drawings, and specifications. Material purchase and installation of the Boot Cleaning Station; per the plan drawings, and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated the Fire Pit Rings, per the plan drawings and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated Campsite ID Posts, per the plan drawings and specifications. Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. The removal of all construction materials; including all temporary erosion and sediment control BMPs. Bid Alternate #1: Material purchase and installation of two rail Split Rail Fence, including footings, using Black Locust Wood, as an optional replacement for the three rail Split Rail Fence shown, per the plan drawings and specifications. Bid Alternate #2: Material purchase and installation of Marie Antoniette Replica Fencing, including footings, using decorative stone pillars, and Black Locust Beams in place of the three rail Split Rail in the location shown, per the plan drawings and specifications.
Posted Date
Oct 9, 2025
Due Date
Jan 16, 2026
Release: Oct 9, 2025
Close: Jan 16, 2026
Demolition and site preparation for proposed project items; including land clearing, tree and vegetation removal, and rough grading, per the plan drawings and specifications. Material purchase and installation of the river access grading, including rip-rap slope; per the plan drawings and specification. Material purchase and installation of the Main Park Sign, per the plan drawings and specifications. Material purchase and installation of the Directional Signs, per the plan drawings and specifications. Material purchase and installation of Split Rail Fence, including footings, stain and sealer, per the plan drawings and specifications. Material purchase and installation of River Access Concrete Lattice Ramp with concrete curb surround, per the plan drawings and specifications. Material purchase and installation of the 10’ wide Precast or Cast In Place Concrete River Access Ramp, per the plan drawings and specifications. Material purchase and installation of the 20’x40’ wide Precast or Cast In Place Non-motorized Boat Launch, per the plan drawings and specifications. Material purchase and installation of the Temporary Road to be revegetated, per the plan drawings and specifications. Material purchase and installation of the Entrance Sign; per the plan drawings and specifications. Material purchase and installation of the River Sign; per the plan drawings and specifications. Material purchase and installation of the Rule Sign; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #1, including pipe #1, apron# 1, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #2, including pipe #2, apron# 2, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of the Lattice Concrete Parking, including wheel stops, per the plan drawings and specifications. Material purchase and installation of the Concrete ADA Parking Area, Concrete Walkway, Sign, Paint, and Precast Vehicle Wheel Stops, per the plan drawings and specifications. Material purchase and installation of the Composting Restroom, per the plan drawings and specifications. Material purchase and installation of the Kayak Rack; per the plan drawings, and specifications. Material purchase and installation of the Boot Cleaning Station; per the plan drawings, and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated the Fire Pit Rings, per the plan drawings and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated Campsite ID Posts, per the plan drawings and specifications. Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. The removal of all construction materials; including all temporary erosion and sediment control BMPs. Bid Alternate #1: Material purchase and installation of two rail Split Rail Fence, including footings, using Black Locust Wood, as an optional replacement for the three rail Split Rail Fence shown, per the plan drawings and specifications. Bid Alternate #2: Material purchase and installation of Marie Antoniette Replica Fencing, including footings, using decorative stone pillars, and Black Locust Beams in place of the three rail Split Rail in the location shown, per the plan drawings and specifications.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →