Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across French Azilum, Inc.'s meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
French Azilum, Inc.
Demolition and site preparation for proposed project items; including land clearing, tree and vegetation removal, and rough grading, per the plan drawings and specifications. Material purchase and installation of the river access grading, including rip-rap slope; per the plan drawings and specification. Material purchase and installation of the Main Park Sign, per the plan drawings and specifications. Material purchase and installation of the Directional Signs, per the plan drawings and specifications. Material purchase and installation of Split Rail Fence, including footings, stain and sealer, per the plan drawings and specifications. Material purchase and installation of River Access Concrete Lattice Ramp with concrete curb surround, per the plan drawings and specifications. Material purchase and installation of the 10’ wide Precast or Cast In Place Concrete River Access Ramp, per the plan drawings and specifications. Material purchase and installation of the 20’x40’ wide Precast or Cast In Place Non-motorized Boat Launch, per the plan drawings and specifications. Material purchase and installation of the Temporary Road to be revegetated, per the plan drawings and specifications. Material purchase and installation of the Entrance Sign; per the plan drawings and specifications. Material purchase and installation of the River Sign; per the plan drawings and specifications. Material purchase and installation of the Rule Sign; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #1, including pipe #1, apron# 1, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #2, including pipe #2, apron# 2, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of the Lattice Concrete Parking, including wheel stops, per the plan drawings and specifications. Material purchase and installation of the Concrete ADA Parking Area, Concrete Walkway, Sign, Paint, and Precast Vehicle Wheel Stops, per the plan drawings and specifications. Material purchase and installation of the Composting Restroom, per the plan drawings and specifications. Material purchase and installation of the Kayak Rack; per the plan drawings, and specifications. Material purchase and installation of the Boot Cleaning Station; per the plan drawings, and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated the Fire Pit Rings, per the plan drawings and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated Campsite ID Posts, per the plan drawings and specifications. Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. The removal of all construction materials; including all temporary erosion and sediment control BMPs. Bid Alternate #1: Material purchase and installation of two rail Split Rail Fence, including footings, using Black Locust Wood, as an optional replacement for the three rail Split Rail Fence shown, per the plan drawings and specifications. Bid Alternate #2: Material purchase and installation of Marie Antoniette Replica Fencing, including footings, using decorative stone pillars, and Black Locust Beams in place of the three rail Split Rail in the location shown, per the plan drawings and specifications.
Posted Date
Oct 9, 2025
Due Date
Jan 16, 2026
Release: Oct 9, 2025
French Azilum, Inc.
Close: Jan 16, 2026
Demolition and site preparation for proposed project items; including land clearing, tree and vegetation removal, and rough grading, per the plan drawings and specifications. Material purchase and installation of the river access grading, including rip-rap slope; per the plan drawings and specification. Material purchase and installation of the Main Park Sign, per the plan drawings and specifications. Material purchase and installation of the Directional Signs, per the plan drawings and specifications. Material purchase and installation of Split Rail Fence, including footings, stain and sealer, per the plan drawings and specifications. Material purchase and installation of River Access Concrete Lattice Ramp with concrete curb surround, per the plan drawings and specifications. Material purchase and installation of the 10’ wide Precast or Cast In Place Concrete River Access Ramp, per the plan drawings and specifications. Material purchase and installation of the 20’x40’ wide Precast or Cast In Place Non-motorized Boat Launch, per the plan drawings and specifications. Material purchase and installation of the Temporary Road to be revegetated, per the plan drawings and specifications. Material purchase and installation of the Entrance Sign; per the plan drawings and specifications. Material purchase and installation of the River Sign; per the plan drawings and specifications. Material purchase and installation of the Rule Sign; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #1, including pipe #1, apron# 1, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of Swale Crossing #2, including pipe #2, apron# 2, both headwalls, and split rail fencing; per the plan drawings and specifications. Material purchase and installation of the Lattice Concrete Parking, including wheel stops, per the plan drawings and specifications. Material purchase and installation of the Concrete ADA Parking Area, Concrete Walkway, Sign, Paint, and Precast Vehicle Wheel Stops, per the plan drawings and specifications. Material purchase and installation of the Composting Restroom, per the plan drawings and specifications. Material purchase and installation of the Kayak Rack; per the plan drawings, and specifications. Material purchase and installation of the Boot Cleaning Station; per the plan drawings, and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated the Fire Pit Rings, per the plan drawings and specifications. Coordination with French Azilum to receive and install the French Azilum fabricated Campsite ID Posts, per the plan drawings and specifications. Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. The removal of all construction materials; including all temporary erosion and sediment control BMPs. Bid Alternate #1: Material purchase and installation of two rail Split Rail Fence, including footings, using Black Locust Wood, as an optional replacement for the three rail Split Rail Fence shown, per the plan drawings and specifications. Bid Alternate #2: Material purchase and installation of Marie Antoniette Replica Fencing, including footings, using decorative stone pillars, and Black Locust Beams in place of the three rail Split Rail in the location shown, per the plan drawings and specifications.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.