CityOH
Posted
-
Nov 6, 2026
Grove City Npdes Program Compliance Services RFP
Project consists of cleaning out the existing diversion structure (46a), installing a new weir wall, and removing the existing plugs to the manufacture water quality structure, replacing the engineered soil media of the bioretention basin, removing the outlet structure, sediment, vegetation, reshaping the existing basin and installing a new outlet structure, project consists of replacing the existing weir wall, removing sediment from the outlet pond, regrading the overflow swale, and installing permanent erosion control measures in the overflow swale.
