Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Traffic control; temporary water service; SWPPP implementation and maintenance; 7,796 SY, bituminous pavement removal; 3,559 LF, remove curb and gutter; 926 SY, remove sidewalk; 290 SY, remove driveway; 55 SY, remove valley gutter; clearing, grubbing, and tree removal; 400 CY, topsoil borrow; 2,784 SY, hydroseeding; 1,498 LF, 8" PVC sanitary sewer; 775 LF, 4" PVC sanitary service; 25 ea, sanitary sewer service connection; 6 ea, connection to existing sanitary sewer; 88 LF, 48" sanitary sewer manhole; 378 LF, 1" HDPE water service; 1,877 LF, 6" c-900 PVC watermain; 11 ea, 6" gate valve; 7 ea, connect to existing water main; 19 ea, curb stops & connect to existing service; 4 ea, install fire hydrant; 92 LF, 12" storm sewer pipe; 8 LF, 48" strom manhole; 18 LF, storm catch basin (30"); 8,869 SY, geotextile fabric; 3,559 LF, curb & gutter - standard; 47 SY, concrete valley gutter; 346 SY, concrete driveway; 878 SY, concrete sidewalk; 100 SF, truncated domes; 2,740 CY, aggregate base (Compacted in place); 6,854 SY, 4" bituminous pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 8, 2026
Close: Jan 27, 2026
Street & Utility Reconstruction Project.
AvailableThe City of Fremont, Ohio is soliciting qualifications from professional engineering and surveying firms for the South 5th Street Reconstruction project. Bids/qualifications are due on January 23, 2026 at 2:00 PM Eastern Time via the City’s Becker Impressions Online Planroom. The opportunity is currently open and is posted under the City of Fremont on the planroom.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
The City of Fremont, Ohio is soliciting qualifications from professional engineering and surveying firms for the South 5th Street Reconstruction project. Bids/qualifications are due on January 23, 2026 at 2:00 PM Eastern Time via the City’s Becker Impressions Online Planroom. The opportunity is currently open and is posted under the City of Fremont on the planroom.
AvailableProcurement of services for arterial street resurfacing, including milling, asphalt concrete pavement placement, micro-surfacing, concrete repairs, utility adjustments, sign replacement, and traffic striping on Oxnard Blvd, 5th Street, Saviers Road, and Ventura Road.
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
Procurement of services for arterial street resurfacing, including milling, asphalt concrete pavement placement, micro-surfacing, concrete repairs, utility adjustments, sign replacement, and traffic striping on Oxnard Blvd, 5th Street, Saviers Road, and Ventura Road.
AvailableProject includes removal and PCC paving of the existing pavement along SE 5th Street from SE Little Beaver Drive to Trail Ridge Road and SE 6th Street from SE Little Beaver Drive to Trail Ridge Road in the City of Grimes. The construction includes approximately 3,370 SY of 7” PCC Pavement, 3,832 SY of 6” Granular Subbase, 684 LF of storm sewer less than or equal to 15" diameter, and 4 intakes. Other associated improvements include: removal & replacement of existing driveways & sidewalk pavement, erosion control, surface restoration, and miscellaneous associated work necessary to complete the project.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Project includes removal and PCC paving of the existing pavement along SE 5th Street from SE Little Beaver Drive to Trail Ridge Road and SE 6th Street from SE Little Beaver Drive to Trail Ridge Road in the City of Grimes. The construction includes approximately 3,370 SY of 7” PCC Pavement, 3,832 SY of 6” Granular Subbase, 684 LF of storm sewer less than or equal to 15" diameter, and 4 intakes. Other associated improvements include: removal & replacement of existing driveways & sidewalk pavement, erosion control, surface restoration, and miscellaneous associated work necessary to complete the project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis