Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes removal and PCC paving of the existing pavement along SE 5th Street from SE Little Beaver Drive to Trail Ridge Road and SE 6th Street from SE Little Beaver Drive to Trail Ridge Road in the City of Grimes. The construction includes approximately 3,370 SY of 7” PCC Pavement, 3,832 SY of 6” Granular Subbase, 684 LF of storm sewer less than or equal to 15" diameter, and 4 intakes. Other associated improvements include: removal & replacement of existing driveways & sidewalk pavement, erosion control, surface restoration, and miscellaneous associated work necessary to complete the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
1,567 LF of 8" trenchless PVC water main and 80 LF of 8" trenched water main. Other associated improvements include: full depth PCC pavement patching, removal & replacement of existing driveway, removal & replacement of sidewalk pavement, fire hydrant removal and installation, water service installation, erosion control, surface restoration and miscellaneous associated work necessary to complete the project.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
1,567 LF of 8" trenchless PVC water main and 80 LF of 8" trenched water main. Other associated improvements include: full depth PCC pavement patching, removal & replacement of existing driveway, removal & replacement of sidewalk pavement, fire hydrant removal and installation, water service installation, erosion control, surface restoration and miscellaneous associated work necessary to complete the project.
AvailableProvide street reconstruction.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Provide street reconstruction.
Available2026 street reconstruction projects.
Posted Date
Dec 3, 2025
Due Date
Jan 9, 2026
Release: Dec 3, 2025
Close: Jan 9, 2026
2026 street reconstruction projects.
AvailableProject includes the reconstruction street and includes a 26-foot wide 8-inch depth pcc urban roadway section. The project will include 6-inch modified subbase, longitudinal subdrain, storm sewer, sanitary sewer, and water main replacement, 6-inch pcc driveways, 5-foot-wide sidewalks, and ada curb ramps. Bid alternate 1: the project also includes additional storm sewer replacement along 9th street which will include driveway and sidewalk replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Project includes the reconstruction street and includes a 26-foot wide 8-inch depth pcc urban roadway section. The project will include 6-inch modified subbase, longitudinal subdrain, storm sewer, sanitary sewer, and water main replacement, 6-inch pcc driveways, 5-foot-wide sidewalks, and ada curb ramps. Bid alternate 1: the project also includes additional storm sewer replacement along 9th street which will include driveway and sidewalk replacement.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis