CityIA
Posted
Aug 26, 2026
Sep 9, 2026
Cedar Valley Nature Trail Erosion Repairs
Work generally consists of removal of existing trail damaged by erosion along with impacted chain link fencing. Project includes shaping of the riverbank and then placement of erosion control rock bags along the riverbank. Once the riverbank is repaired, a new section of asphalt trail and fencing will be installed.