Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dredge material management area construction regrading/raising the disposal site berms to an elevation of 36'. The berms are currently at elevation 34'and have settled in a few places to below 34 ft. The work will also include the relocation of two existing spill boxes 50 60 feet into the disposal site. The existing access dirt and stone access ramp will need to be regraded, as well, to meet the new top-of-berm elevation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The U.S. Army Engineer Research and Development Center (ERDC), Coastal Hydraulics Laboratory (CHL) issued an RFQ for dredge material placement model supplies. This solicitation is a Small Business set-aside, with the government intending to award a single purchase order based on a Lowest Priced Technically Acceptable (LPTA) evaluation. The solicitation was published on January 14, 2026, and responses are due by January 28, 2026.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Engineer Research and Development Center (ERDC), Coastal Hydraulics Laboratory (CHL) issued an RFQ for dredge material placement model supplies. This solicitation is a Small Business set-aside, with the government intending to award a single purchase order based on a Lowest Priced Technically Acceptable (LPTA) evaluation. The solicitation was published on January 14, 2026, and responses are due by January 28, 2026.
Available1 EA of 24” 90-degree fitting, stainless SCH 40; 304L; 1 EA of 24” Stainless pipe SCH 40; 304L 20’.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
1 EA of 24” 90-degree fitting, stainless SCH 40; 304L; 1 EA of 24” Stainless pipe SCH 40; 304L 20’.
AvailableThe work consists of satisfactory removal of material within the limits of the Hopper Dredge Disposal Area (HDDA) Borrow Site and disposal of material within the limits of the restoration areas to the required dimensions, as shown on the contract drawings and as specified herein.
Posted Date
Jun 26, 2024
Due Date
Jun 26, 2026
Release: Jun 26, 2024
Close: Jun 26, 2026
The work consists of satisfactory removal of material within the limits of the Hopper Dredge Disposal Area (HDDA) Borrow Site and disposal of material within the limits of the restoration areas to the required dimensions, as shown on the contract drawings and as specified herein.
AvailableProject management/ construction management services.
Posted Date
Oct 9, 2025
Due Date
Dec 1, 2026
Release: Oct 9, 2025
Close: Dec 1, 2026
Project management/ construction management services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →