CityNE
-
Closes
Aug 19, 2026
Warehouse Lower Roof Replacement HU 2026-76 RFP
The City of Hastings is soliciting a single-contractor, design‑build team to demolish and replace the existing standing‑seam metal roof and associated long‑tab insulation on its municipal warehouse. The work includes full demolition, installation of a new aluminum‑zinc alloy standing‑seam roof system, cavity‑fill long‑tab insulation with vapor barrier, gutters, downspouts, and all related site services, with a 365‑day completion window. The solicitation requires bonding (5% bid bond and full performance/payment bond), required insurance, and liquidated damages for late completion.