Ford Island Hawaii Roll Up Door RFP
The anticipated project includes, but is not limited to: Furnishing and installing a large roll-up door within an existing non-load-bearing concrete masonry unit (CMU) wall. Demolition, cutting, removal, framing, finishing, and related work necessary to create the new door opening. Relocation and/or modification of affected utilities, including electrical power, compressed air, and water lines. Relocation of an existing air-conditioning unit and associated ductwork to accommodate installation and operation of new equipment. Restoration of affected interior and exterior finishes.